Architecture World 6 · Move and Modernise · Stage 4
Pay Less, Size Right
The first month's bill after the move, as a meter. Rightsize, commit, alert, allocate, and watch the number fall.
- Compute Optimizer
- Savings Plans against Reserved Instances
- Budgets
- Cost and Usage Report
- Cost allocation tags
- Trusted Advisor
- Storage Lens
- Service Quotas
- Domain
- Core architecture
- World
- Architecture World 6: Move and Modernise (Professional)
- Game type
- Cost meter: Cut the month's bill line by line without breaking a requirement.
- Time
- About 30 minutes on a first attempt (estimated)
- Exam guides